- Outline & Statements of Case
- SPM-OSOC Outline Statement – Llandinam
- Inquiry Documents
- SPM-001 Comments on location & PI format – SP Manweb representations on CPI programme
- SPM-002 Response to ALL-002 – 14 Feb 13
- SPM-003 Submission 12 March Re Draft Timetable issue 8th March 2013
- SPM-004 Letter dated 5th April 2013 in response to RWE-005 28th March letter
- SPM-005 Opening Statement on behalf of Manweb – Llandinam – 030613
- SPM-006 Letter dated 27 Jun 2013 re Cumulative Impacts
- SPM-SOC-OHL SPM Manweb Statement of Case
- SPM-007 Letter to Inspector Re: SOCG
- SPM-008 Letter to the Inspector Re: Clarification on Session 3 Matters to be heard
- SPM-009 – Draft Conditions for Discussion
- SPM-010 – Note following the evidence of Mr Leavy
- SPM-011 – Note following the evidence of Mr Rory Brooke
- SPM-012 – no document/ possible duplication of numbering
- SPM-013 – Routes D & E-& Newtown Bypass & Properties
- SPM-014 – Response to various queries raised during the evidence of Dr Beddoes and Mr Paalman.
- SPM-015 – Clarification Document
- SPM-016 – Powys Windfarm Scenario – January 2014 SP Manweb Produced
- SPM-017 – Llandinam Updated ES – Viewpoint Pole Measures- reduced
- SPM-018 Paper Explaining Regulatory Scrutiny SPM is Subject To
- SPM/019 – BOW138 Llandinam 132Kv Pond Assessment, Glanmiheli, Glan-Mule, Powys
- SPM/020 – RESPONSE OF MRS GIBSON TO VARIOUS QUERIES
- SPM/020a – Appendices to Mrs Gibson’s response to various queries
- SPM/021 – Description of 4 x 4 Crane Truck
- SPM/022 – Statement of Common Ground Planning and Energy
- SPM/023 – A3 document showing sight lines from the viewpoints set out in figure 1 at appendix 3 to Mr Croft’s proof of evidence
- SPM/024 – Table collating the assessment conclusions of Mr Croft, the updated environmental statement of 2013 and Mr Bonner
- SPM/025 – Response of SP Manweb to various undergrounding options outlined during weeks 1 and 2 by PCC and NRW
- SPM/025a – Appendix to SPM/025
- SPM/026 – Letter from CADW 3rd June 2013
- SPM/027 – Response of David Bonner on various cultural heritage matters raised during session 3 of the conjoined inquiry
- SPM-028-1 Briefing Note for Session 4
- SPM-028-1a Briefing Note for Session 4 – Appendix – Project Update
- SPM/028 – Response to Statements of Case Session 4
- SPM/029 – Remote Earthing Paper
- SPM/030 – Small Generation Paper
- SPM/031 – Separation Distance Between Parallel Lines
- SPM/031a – Separation Distance Between Parallel Lines – Appendix
Pages
- Home
- News
- Inquiry Programme
- Introductory Meeting
- Pre- Inquiry Meeting
- Documents
- S36/37 Application Documents
- Vattenfall – Inquiry Documents
- Fferm Wynt Llaithddu Cyf – Inquiry Documents
- CeltPower Limited – Inquiry Documents
- RES UK & Ireland Limited – Inquiry Documents
- RWE NPower Renewables Limited – Inquiry Documents
- SP Manweb PLC – Inquiry Documents
- Consultee Documents
- Supporter Documents
- Inspector Documents
- Public Notice & Registration
- Objector Documents
- Statements of Common Ground
- Core Documents
- Proofs of Evidence
- Cumulative Effects SEI
- Conditions
- Closing Statements
- Inquiry Venue
- Who’s Who
- Links
- Timetable of Key Dates
- Programme Officer